Crown Cement Powers Up: 5 New E-Cranes Revolutionize Raw Material Handling
As one of Bangladesh’s leading cement manufacturers, Crown Cement PLC has significantly enhanced its raw material handling operations by installing 5 new E-Cranes at its main plant. This advancement has streamlined the unloading of essential cement raw materials – such as clinker, slag, limestone, and gypsum – resulting in reduced unloading times and improved overall productivity.
This journey began back in 2011, when Crown Cement installed two 700 Series E-Cranes at its facility in West Mukterpur, Munshiganj.
In 2017, the company introduced a different brand of unloading crane to accommodate its growing demand. However, due to unsatisfactory performance as well as increased unloading requirements, it became clear that a more robust and high capacity solution was needed. Consequently – in 2022 – Crown Cement placed an order for five 1000C Series (model EH7290 PD-E) E-Cranes to replace the 4 existing machines. Over time these new cranes were installed at multiple locations within the same plant, with commissioning of the last unit being completed by the end of August 2025.
The decision to upgrade from the 700 Series to the higher-capacity 1000C Series driven by limited river frontage, which necessitated maximizing unloading capacity within a constrained area. The original 700 Series E-Cranes were successfully relocated to other Crown Cement plants, where they continue to operate effectively.
As of the latest records, their operational hours are:
- Crown Cement 1 – 64,360 hours
- Crown Cement 2 – 69,130 hours
Both the newly installed 1000C Series E-Cranes as well as the relocated 700 Series cranes are currently functioning efficiently, playing a vital role in supporting Crown Cement’s ongoing operations.
Related Post
Hitachi Construction Machinery (Europe) and Akkodis...
Hitachi Construction Machinery Europe N.V. (HCME), currently transitioning to the LANDCROS brand, today announced a strategic partnership wi...
Successful commissioning of petcoke silo at...
Following the successful start-up of the Delayed Coker Unit at the Rijeka Refinery in Croatia, we are pleased to announce the successful com...
A new digital experience: Discover the...
We are excited to announce the launch of our brand-new E-Crane website! With a fresh design, improved navigation and a stronger focus on use...








Leave us a comment
logged inYou must be to post a comment.