BEUMER Group commissions Germany’s highest bucket elevator Geared towards high capacities

BEUMER Group has successfully delivered, installed and commissioned the highest bucket elevator in Germany at HeidelbergCement AG in Schelklingen near Ulm. The order is part of a project by thyssenkrupp Industrial Solutions, with the objective to extensively modernise the cement plant and comply with the new limit values for pollutant emissions.

 As part of the thyssenkrupp Industrial Solutions project, a new preheater tower was built at HeidelbergCement’s Schelklingen site near Ulm, where a BEUMER Group bucket elevator is used to feed raw meal to the kiln. This high-capacity belt bucket elevator has a centre distance of 131.8 metres and, with a bucket width of 800 millimetres, achieves an output of 400 tons per hour. The installed steel cord belt transfers tractive forces of up to 200 tons.

HeidelbergCement AG and the cement plant place great value on noise and dust protection. BEUMER Group therefore determined the use of a high-capacity belt bucket elevator was necessary, which is characterized by extremely smooth running and reliable operation.

 

Attachments

Related Post

thumbnail
hover

Reliable Hitachi equipment and trusted Rotator...

The largest fleet of Hitachi mining equipment in Europe has proved to be one of the vital ingredients in the success of Terrafame’s nickel...

thumbnail
hover

Broekman Logistics expands heavy-lift capacity in...

A Liebherr mobile harbour crane of type LHM 800, configured for demanding project cargo and heavy-lift operations, is strengthening lifting ...

thumbnail
hover

LHM 600 supports evolving vessel demands...

With a lifting capacity of 104 tonnes and a maximum outreach of 61 metres, the Liebherr LHM 600 is now the largest mobile harbour crane oper...

Leave us a comment

logged inYou must be to post a comment.