BEUMER Group commissions Germany’s highest bucket elevator Geared towards high capacities

BEUMER Group has successfully delivered, installed and commissioned the highest bucket elevator in Germany at HeidelbergCement AG in Schelklingen near Ulm. The order is part of a project by thyssenkrupp Industrial Solutions, with the objective to extensively modernise the cement plant and comply with the new limit values for pollutant emissions.

 As part of the thyssenkrupp Industrial Solutions project, a new preheater tower was built at HeidelbergCement’s Schelklingen site near Ulm, where a BEUMER Group bucket elevator is used to feed raw meal to the kiln. This high-capacity belt bucket elevator has a centre distance of 131.8 metres and, with a bucket width of 800 millimetres, achieves an output of 400 tons per hour. The installed steel cord belt transfers tractive forces of up to 200 tons.

HeidelbergCement AG and the cement plant place great value on noise and dust protection. BEUMER Group therefore determined the use of a high-capacity belt bucket elevator was necessary, which is characterized by extremely smooth running and reliable operation.

 

Attachments

Related Post

thumbnail
hover

Hitachi presents popular ZW-7 wheel loaders...

The extensive line-up on the Hitachi Construction Machinery (Europe) NV (HCME) stand at Bauma 2025 includes several industry-leading models ...

thumbnail
hover

Martin Engineering opens new business unit...

Neponset, IL, USA: The world leader in bulk handling solutions, Martin Engineering, has announced fresh expansion in Central Asia with a new...

thumbnail
hover

Liebherr STS for TraPac on West...

TraPac orders two Liebherr STS First Liebherr STS for the West Coast of the USA Significant upgrade in TraPac Oakland’s capabilities Liebh...

Leave us a comment

logged inYou must be to post a comment.