1.5M tons handled in March! – Magdragon II Picks Up The Pace.
Magdragon II is a floating transfer station – operating close to Cape Preston in the Pilbara Region of West-Australia – with two 3000B series E-Cranes designed to unload magnetite from ocean going barges into hoppers, which feed a conveyor system and ship loader. The transfer station mainly loads Mini Cape vessels destined for China. Magdragon II handled close to 1.5 million tons of magnetite iron ore in March 2020. E-Crane would like to congratulate all at Citic Pacific Mining with this record throughout, especially considering the challenging working conditions during this Covid-19 pandemic.
Related Post
Minimal Footprint, Maximum Elevation: A greener...
Biomass energy has been integral to human life since the dawn of civilization, starting with the burning of wood for cooking and heating. To...
LANDCROS One lands prestigious Red Dot...
Hitachi Construction Machinery (Europe) NV (HCME) is proud to announce that its concept excavator, LANDCROS One, is the winner of a prestigi...
AUMUND Group expands its portfolio with...
AUMUND is pleased to announce that, as of June 25, 2025, ESI Eurosilo B.V., headquartered in Purmerend, the Netherlands, has officially join...
Leave us a comment
logged inYou must be to post a comment.