1.5M tons handled in March! – Magdragon II Picks Up The Pace.

Magdragon II is a floating transfer station – operating close to Cape Preston in the Pilbara Region of West-Australia – with two 3000B series E-Cranes designed to unload magnetite from ocean going barges into hoppers, which feed a conveyor system and ship loader. The transfer station mainly loads Mini Cape vessels destined for China. Magdragon II handled close to 1.5 million tons of magnetite iron ore in March 2020. E-Crane would like to congratulate all at Citic Pacific Mining with this record throughout, especially considering the challenging working conditions during this Covid-19 pandemic.

Attachments

Related Post

thumbnail
hover

First electric Hitachi ultra-large excavator in...

The first electric Hitachi EX2600-7E ultra-large excavator in Europe has been delivered in March 2026 by authorised Hitachi dealer West Balk...

thumbnail
hover

Connected machines and minds

From intelligent assistance systems that make earthmoving safer and more efficient to interdisciplinary teams shaping our next generation of...

thumbnail
hover

Leadership change at Port of Antwerp-Bruges:...

Behind the scenes, discussions about a change in leadership at the Port of Antwerp-Bruges had been underway for some time. The organisation ...

Leave us a comment

logged inYou must be to post a comment.