Protecting What Matters: Our New Paint Hall in Adegem, Belgium
At E-Crane, we know that corrosion protection is key to ensuring long-lasting performance and reliability. That’s why we’re excited to share a major step forward in our commitment to quality — the opening of our brand-new paint hall at our headquarters in Adegem, Belgium!

While all major crane parts continue to be expertly coated in our fully equipped paint hall at our steel factory – Famaba, Poland, we wanted to expand our capabilities even further. Our new Adegem facility now allows us to paint and finish parts and components directly at our Assembly Factory, giving us even more flexibility and control over every step of the process.

This 2025 investment includes:
– A dedicated paint storage room and “paint kitchen” for precise preparation.
– A heated, climate-controlled paint hall for optimal painting conditions all seasons.
– An innovative recirculation system that drastically reduces gas consumption — combining top performance with energy efficiency.
With this new facility, E-Crane continues to ensure the highest level of corrosion protection, exceptional finish quality, and environmentally responsible operations.
Because at E-Crane, we don’t just build cranes — we protect them for a lifetime of performance.

Related Post
Bulk Cargo: Expert Advice for Solving...
Runoff can be an issue for many ports, making spillage from conveyors an added concern. Belt conveyor operators in high-volume ports and t...
DP World Constanța expands capabilities with...
Two mobile harbour cranes of type LHM 600 were delivered, equipped for tandem lifts of up to 400 tonnes with advanced electric drive and int...
PORT OF SOUTH LOUISIANA BOARD OF...
The Port of South Louisiana (PortSL) today announced that Julia Fisher-Cormier has been selected as the next Executive Director following a ...









Leave us a comment
logged inYou must be to post a comment.