Bedeschi new engineering study for the optimization of a 9,000 kw overland conveyor in South America
Bedeschi is pleased to announce the award of a new conceptual and trade-off engineering study for the operational optimization and revamping of a 9,000 kW overland conveyor in South America.
The project involves the modernization and redesign of critical conveyor subsystems, including:
- Booster drive system and pulley: maximize the full system efficiency by optimizing key mechanical components
- Electrical rooms and control logic: ensuring smooth and dynamic transition by updating control and power integration
- Braking system: redesigning stopping controls
- Take-up systems: analysis and re-engineering for optimal control of belt tension and elongation
This project also benefits from the expertise of Bedeschi high-performance conveyor engineering team based in Germany, with a long-standing experience in designing and optimizing conveyor systems for mining and bulk handling operations. At Bedeschi, we remain committed to drive technical excellence and innovation across the world.
Related Post
Bedeschi announces a new project for...
Bedeschi has closed a new deal for supplying a new thermal power plant in Vietnam. The project includes the engineering and supply of a comp...
Nine Startups Selected for the Pitch...
Hitachi Construction Machinery (Head Office: Taito-ku, Tokyo, Japan; President and Executive Officer: Masafumi Senzaki; “Hitachi Construct...
Martin Engineering appoints Ashwini Khunte as...
PUNE, INDIA – Global leader in bulk material handling solutions, Martin Engineering, has appointed Ashwini Khunte as General Manager of it...






Leave us a comment
logged inYou must be to post a comment.