Mobile stockpiling system in heap-leaching application

Boost Production Rates

Telestack’s equipment enabled to achieve maximum production rates by efficiently stockpiling gold ore at up to 1000TPH significantly enhancing the customers’ overall productivity.

Reduce Maintenance and Downtime

The robust design and reliability of Telestack’s equipment minimised operational interruptions, reducing maintenance needs and downtime that were outlined from the customer as previous issues with other manufacturers used prior.

Maintain High Throughput Rates

The system, featuring advanced conveyors and stackers, ensured consistent material flow and maintained high throughput, allowing Polyus Aldan to optimise its Heap Leaching process and sustain high production levels.

The Polyus

The Polyus Gold solution comprised of three units. Firstly a TCL 1031 Tracked “Cross“ Conveyor, a HIC 40 Horizontal Index Conveyor and also a TS 1042 Radial Telescopic Stacker.

Watch this video or read the full case study to find out more!

 

Related Post

thumbnail
hover

Customers meet the new-design Konecranes Noell...

On Thursday the 26th of September,  Konecranes was privileged to receive an eminent group of straddle carrier customers at its  straddle c...

thumbnail
hover

Ports of Indiana partners with OmniTRAX...

Ports of Indiana and OmniTRAX have announced the creation of the Mount Vernon Railroad to serve the Southwest Indiana port. The railroad’s...

thumbnail
hover

80 years of innovation and growth...

The world leader in bulk handling solutions, Martin Engineering, is marking 80 years of product innovation, engineering expertise and global...

Leave us a comment

logged inYou must be to post a comment.