Mobile stockpiling system in heap-leaching application

Boost Production Rates

Telestack’s equipment enabled to achieve maximum production rates by efficiently stockpiling gold ore at up to 1000TPH significantly enhancing the customers’ overall productivity.

Reduce Maintenance and Downtime

The robust design and reliability of Telestack’s equipment minimised operational interruptions, reducing maintenance needs and downtime that were outlined from the customer as previous issues with other manufacturers used prior.

Maintain High Throughput Rates

The system, featuring advanced conveyors and stackers, ensured consistent material flow and maintained high throughput, allowing Polyus Aldan to optimise its Heap Leaching process and sustain high production levels.

The Polyus

The Polyus Gold solution comprised of three units. Firstly a TCL 1031 Tracked “Cross“ Conveyor, a HIC 40 Horizontal Index Conveyor and also a TS 1042 Radial Telescopic Stacker.

Watch this video or read the full case study to find out more!

 

Related Post

thumbnail
hover

Ports of Indiana CEO Jody Peacock...

Jody Peacock, CEO of Ports of Indiana, has been named one of the inaugural recipients of the CARGO Award, presented by Inland Rivers, Ports ...

thumbnail
hover

Strengthening Belgian-Bangladeshi Connections

On August 5, E-Crane Bangladesh had the pleasure of welcoming His Excellency Mr. Didier Vanderhasselt, Ambassador of Belgium to Bangladesh ...

thumbnail
hover

Built for Versatility: The Carver Companies’...

Another application for the Carver Company’s 3000 Series E-Crane, Model EC19421 CR-D was an overwhelming success as the dockside craw...

Leave us a comment

logged inYou must be to post a comment.